假山模型小樣如何快速製作完成?

一座塑石假山作品的完成,少不了前期的精心的設計,還有假山模型和小樣的校對。對於的假山製作公司,是必須具備假山模型的製作技能的,而假山模型小樣如何快速製作完成?南京遠太作為的假山公司,為大家介紹一下我公司的快速製作假山模型工藝。
The completion of a stone-sculpture rockery works, is inseparable from the early careful design, as well as rockery model and small sample proofreading. For professional rockery companies, it is necessary to have the skills to make rockery model, and how to make rockery model sample quickly? Nanjing Yuantai as a professional rockery company, for you to introduce our company's rapid production of rockery model technology.
快速假山模型掌製作工藝,是在對塑石假山造型充分熟悉的情況下完成的,摒棄泡沫塑形的費時費力,直接采用鋼筋焊接骨架,小型的假山模型承載力較小,可以不設置支撐結構,鋼筋的承受力可以完成。我公司嫻熟的美工可以在2個小時完成假山模型的鋼筋骨架焊接。
The manufacturing process of the fast rockery model palm is completed under the full familiarity with the plastic rockery shape. It takes time and effort to discard the foam molding and directly adopts the reinforcing steel welding skeleton. The small rockery model has smaller bearing capacity and can not set up the supporting structure, and the bearing capacity of the reinforcing steel bar can be completed. The skilled artists in our company can finish the reinforcement skeleton welding of the rockery model in 2 hours.
綁網和砂漿塑麵工序,與塑石工藝類似。為減少水泥砂漿的凝固時間,采用GRC快幹水泥砂漿兩層完成砂漿塑麵,包裹鐵絲網。此工序的時間僅需要2個小時,較普通水泥砂漿製作工藝,節省了近12小時的操作時間,同時節省了砂漿的凝固時間。
濟南假山製作
The process of binding net and mortar is similar to that of plastic molding. In order to reduce the setting time of cement mortar, two layers of GRC quick-drying cement mortar were used to complete the plastic surface of mortar and wrap the wire mesh. This process takes only 2 hours. Compared with ordinary cement mortar production process, it saves nearly 12 hours of operation time and the setting time of mortar.
假山紋理雕刻階段,是模型的製作關鍵階段。需要表現假山模型的小造型細節和石紋紋理,采用複合砂漿來完成,美工砂漿塗抹和雕刻的時間較長,2平方的假山模型需要製作時間約6小時。為了增加美工的雕刻時間,複合砂漿中添加緩凝劑,延長砂漿的凝固期,紋理雕刻完成後,需要放置12小時,然後進行砂漿保養。
Rockery texture carving stage is the key stage of model making. It needs to show the small modeling details and stone grain texture of the rockery model, using composite mortar to complete, the painting and carving time of artistic mortar is longer, 2 square rockery model takes about 6 hours to make. In order to increase the carving time of the artist, the retarder is added to the composite mortar to prolong the solidification period of the mortar. After the texture carving is finished, it needs to be placed for 12 hours, and then the mortar is maintained.
假山模型的麵層保養完成後,就可以進行顏色噴塗和假山表體裝飾了,顏色先采用易於調配的丙烯顏料,凝固時間短,60分鍾完成假山作色,60分鍾進行植物及雕塑小品的裝飾。
After the surface layer of the rockery model is maintained, the rockery surface can be painted and decorated. The color of the rockery is first made of propylene pigment which is easy to mix. The setting time is short, the rockery is finished in 60 minutes, and the decoration of plants and sculptures is completed in 60 minutes.
經過約12小時的緊張製作和24小時的保養,假山模型就製作完成了。這個速度是不是很快?但該工藝手法需要經驗豐富的美工來完成,同時材料采購及時。我公司承接的大中型塑石假山項目均需要製作模型小樣,按設計圖紙縮小比例來完成,大部分模型小樣均得到了客戶的認可。
After about 12 hours of tense production and 24 hours of maintenance, the rockery model was completed. Is this speed very fast? But this process requires skilled artists to complete, and materials are purchased in a timely manner. Our company undertakes large and medium-sized plastic rockery projects need to make model samples, according to the design drawings to reduce the proportion of completion, most of the model samples have been recognized by customers.
本文內容來源:濟南假山製作,想要了解更多請點擊秋葵视频官网入口下载的網站:http://www.lounge-f.com
Source of this article: Jinan rockery production, to learn more please click our website: http://www.lounge-f.com.