  製作塑山景觀的時候,一般都需要焊接鋼結構骨架,用以支撐塑山造型。小型的塑山景觀采用角鋼結構,大型的塑山體則采用槽鋼或工字鋼等大型鋼結構。鋼結構的固定采用焊接和錨固兩種方式進行,下麵介紹塑山骨架具體的固定方式。
  When making plastic mountain landscape, it is generally necessary to weld steel structure skeleton to support plastic mountain modeling. Small plastic mountain landscape uses angle steel structure, large plastic mountain body uses channel steel or I-beam steel and other large steel structures. The steel structure is fixed by welding and anchoring. The concrete fixing method of plastic mountain skeleton is introduced below.
  一、連接加固與加固件連接
  I. Connection and Reinforcement and Connection of Reinforcement Parts
  鋼結構的連接方法就是焊縫、鉚釘、普通螺栓和高強度螺栓連接,要根據需要加固的原因、目的、構造以及施工條件,同時還需要考慮結構原有的連接方法方可確定。
  The connection method of steel structure is weld, rivet, ordinary bolt and high strength bolt. It should be strengthened according to the reasons, purposes, structure and construction conditions. At the same time, the original connection method of the structure should be considered.
  鋼結構加固一般比較適合采用焊縫連接、摩擦型高強度螺栓連接,也可以依據焊縫和摩擦型高強度螺栓混合連接,當采用焊縫連接時,需采用經評定認可焊接工藝及連接的材料。
  Steel structure reinforcement is generally more suitable for weld connection, friction type high strength bolt connection, can also be based on weld and friction type high strength bolt hybrid connection, when using weld connection, it is necessary to adopt approved welding technology and connecting materials.
濟南假山製作
  二、加大構件截麵加固
  2. Reinforcement of Increased Section of Members
  在采用加大截麵加固鋼構件的時候,對於所選擇的截麵形式要有利於加固技術要求,還要考慮已經有的缺陷和損傷的狀況。截麵加固完成後,需要進行特定測定,以確定固定的牢固度。
  When strengthening steel members with enlarged cross-section, the selected cross-section form should be conducive to the technical requirements of strengthening, and the existing defects and damage conditions should also be taken into account. After section reinforcement is completed, specific measurements are needed to determine the fixed firmness.
  三、裂紋修複與加固
  3. Crack Repair and Reinforcement
  塑山骨架因為荷載反複作用以及材料的選擇、構造、製造、施工安裝不當等而產生脆斷傾向星裂紋損傷,要設法去修複,修複之前要分析產生的裂紋的原因以及嚴重性,有針對性的采取改善結構實際工作或進行塑山加固措施。不適宜采用修複加固的構件,要給予拆除更換。
  Because of repeated loading and improper material selection, construction, manufacture, construction and installation, the plastic mountain skeleton tends to be fragile and tends to star crack damage. We should try to repair it. Before repair, we should analyze the causes and seriousness of the cracks, and take targeted measures to improve the actual work of the structure or reinforce the plastic mountain. It is not suitable to use repairing and reinforcing components, so they should be demolished and replaced.
  以上幾種加固的方式是塑山骨架的主要固定方式,所有焊接和錨固完成後均要進行測定,同時進行防鏽防腐處理。骨架固定完成後將進行塑山的麵層製作,麵層鋼筋與骨架焊接將確定塑山的大體造型。
  The above reinforcement methods are the main fixing methods of the plastic mountain skeleton. After all welding and anchorage are completed, they should be measured, and rust-proof and corrosion-proof treatment should be carried out at the same time. After the fixing of the skeleton, the surface of the plastic mountain will be made, and the welding of the surface steel bar and the skeleton will determine the overall shape of the plastic mountain.