承接項目
新聞中心

哪些因素會影響假山生產價格?

  對於假山製作項目,國家並沒有明確的估價方式,在行業中也沒有統一的標準,很多客戶都很困惑。對於所涉及的預算和審計,信息也很難做到。恒泰園林作為假山生產單位,根據經驗總結出一些影響假山生產價格的因素,哪些因素會影響假山生產價格?
  For the rockery production project, the state does not have a clear way of valuation, and there is no unified standard in the industry, many customers are confused. Information is also difficult to achieve for the budget and audit involved. Hengtai garden, as a professional rockery production unit, summarizes some factors influencing rockery production price based on experience, and which factors will affect rockery production price?
  1、施工技術
  1. Construction technology
  假山生產過程是不同的,每個技術人員和材料使用過程中是不同的,類型的技術人員做假山的價格影響更大,更受歡迎迪士尼假山技術,技術人員技術人員短缺,工資較高,這種類型假山的價格高;而黏土假山較為常見,因為製作過程相對簡單,價格較低。根據不同的施工工藝,假山製作的價格一般在每平方200 - 600元之間。
  The rockery production process is different, and each technician and material use process is different. The price of rockery made by the type of technician has a greater impact and is more popular with Disney rockery technology. The technician is short of technicians and has a higher salary, so the price of this type of rockery is higher; while clay rockery is more common, because the production process is relatively simple and the price is lower. According to different construction technology, the price of rockery is generally between 200 - 600 yuan per square meter.
濟南假山製作
  2. 建築體積
  2. Building volume
  不同施工體積,會計的生產單價不同,假山大型假山可以根據不同的類型的工作部署,管道操作,平均單價低,更終影響價格的假山,小假山,特別是在規模小於200平方,協調施工不便,更終會計的平方單價較高。
  Different construction volume and accounting production unit price are different. Large rockery can be operated according to different types of work deployment, pipeline operation, low average unit price, rockery and small rockery that ultimately affect the price, especially when the scale is less than 200 square meters, it is inconvenient to coordinate construction, and the final calculated unit price of square meter is higher.
  3.施工難度
  3. Construction difficulty
  施工難度包括山的點、運輸材料的便利性、施工三通一達、假山高的情況下,會降低施工效率,增加施工成本,影響假山生產的價格。施工難度通常是假山製作公司考慮價格的主要方麵,涉及材料損失和人為損失,更終影響假山製作公司的盈利能力。
  The construction difficulty includes the highest point of the mountain, the convenience of transportation materials, the three connections and one access of construction, and the high rockery, which will reduce the construction efficiency, increase the construction cost, and affect the price of rockery production. The difficulty of construction is usually the main aspect of rockery production company considering price, involving material loss and man-made loss, which ultimately affects the profitability of rockery production company.
  4. 施工期間
  4. During construction
  施工周期短,施工質量好,價格低,,你不能保持這三個施工期間影響施工質量,工期的條件下穩定,假山製作公司可以安排建設作為一個整體,有效利用材料和人工假山的保證施工質量,同時也可以降低假山的價格生產。
  The construction period is short, the construction quality is good, and the price is low. You can't keep these three construction periods affecting the construction quality, which is stable under the construction period. The rockery production company can arrange the construction as a whole, effectively use the materials and artificial rockery to ensure the construction quality, and also reduce the rockery price production.
濟南秋葵视频官网二维码下载假山水景園林
技術支持:濟南諾商

谘詢熱線:
13064079165
在線客服